After two months’ repair, the Vermont Yankee nuclear plant can begin operating again. The state senate has ordered it closed for good in 2012. Reversal is possible, but public opinion is heavily against continued operation. Entergy, the operator, said no pipes existed to leak, but they did and did.

CITY TECH BLOG
Switching Our Dependence on Fossil Fuels to Renewable Sources Will Take Time By City Tech Blogger Anthony Romero
Preventing the increase of water vapor released into the atmosphere means we have to switch from fossil fuel production – our main energy source – to renewable energy sources. Climate change has become like a massive snowball rolling down the hill for some time now; it becomes more